Site Management Plan – Cootamundra Quarry
Document No: MBG.090.3.0 | Review Date: November 2020 | Author: Taylor | Approved: Taylor | Pollution Incident Response Management Plan
Campaign Overview
The Cootamundra Quarry site is owned and operated by Milbrae Business Group.
Roles & Responsibilities
Plant & Equipment
The following equipment will be used on site:
Equipment | Plant No. | Min. Safety Standard |
---|---|---|
Excavator | PL 125 | Link |
Loader | PL 11 | Link |
Dump Truck | PL 33 | Link |
SWMS Related to Operations & Equipment
Excavator | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | SWMS(Editable) | SWMS(PDF) | Procedure | |
010 | Using Excavator to Feed Crusher | → Link | ||||
050 | Using Exacavator to Lift | → Link | ||||
077 | Building Pad for Excavator | → Link | ||||
078 | Load Haul Truck with Excavator | → Link | ||||
106 | Operating of Excavator with Hammer | → Link | → Link | |||
195 | EC480D Excavator Isolation | → Link |
Front End Loader | |||||
---|---|---|---|---|---|
Number | Name | Review Date | SWMS(Editable) | SWMS(PDF) | Procedure |
090 | Scalping | → Link | |||
096 | Stockpile Material From Crusher | → Link | |||
098 | Construct Bund Wall | → Link | |||
108 | Load Haul Truck with Loader | → Link | |||
123 | Front End Loader - Loading Bins | →Link | |||
198 | 972H Isolation | → Link | |||
199 | 972H Release of Hydraulic Pressure | → Link | |||
200 | 980H Isolation | → Link | |||
201 | 980H Release of Hydraulic Pressure | → Link | |||
192 | Brake Test - Front End Loader | → Link | |||
196 | Loadrite Calibration | → Link | |||
005 | Loading Trucks With Front End Loader | → Link | |||
076 | Post Blast Cleanup | → Link |
Haul Truck | |||||
---|---|---|---|---|---|
Number | Name | Review Date | SWMS(Editable) | SWMS(PDF) | Procedure |
108 | Load Haul Truck with loader | → Link |
MVP Cone Crusher | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | SWMS(Editable) | SWMS(PDF) | Procedure | |
037 | Changing the Manganese on the MVP Cone Crusher | → Link |
Screens | |||||
---|---|---|---|---|---|
Number | Name | Review Date | SWMS(Editable) | SWMS(PDF) | Procedure |
007 | Replace Screen Mesh | → Link |
Metso LT300 Cone Crusher | |||||
---|---|---|---|---|---|
Number | Name | Review Date | SWMS(Editable) | SWMS(PDF) | Procedure |
008 | Cone Blockage Procedure | → Link | |||
018 | Starting Up Track Mounted Cone Crusher | → Link | |||
019 | Shutting Down Track Mounted Cone Crusher | → Link | |||
020 | Clearing Track Mounted Cone Crusher | → Link | |||
027 | Operating Track Mounted Cone Crusher | → Link | |||
051 | LT300HP Setting up Cone Crusher | → Link | |||
061 | Changing Screens on Cone Crusher | → Link | |||
173 | HP300 Changing Cone Liners | → Link | → [Link][9] |
Powerscreen | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | SWMS(Editable) | SWMS(PDF) | Procedure | |
054 | Changing Screens on Powerscreen | → Link |
General | ||||||
---|---|---|---|---|---|---|
Number | Name | Review Date | SWMS(Editable) | SWMS(PDF) | Procedure | |
011 | Working at Heights | → Link | ||||
013 | Confined Spaces | → Link | ||||
021 | Tyre Changing - Mobile Plant | → Link | ||||
030 | Safe Use EWP | → Link | ||||
031 | Electric Welding | → Link | ||||
034 | Using Electric Power Tools | → Link | ||||
058 | Operating and Refueling Small Motors | → Link | ||||
075 | Spray Painting | → Link | ||||
087 | Changing Drive Belts | → Link | ||||
088 | Patching Belts | → Link | ||||
089 | Roller Changeout | → Link | ||||
097 | Working Alone | → [Link][12] | ||||
100 | General Maintenance of Crushers | → Link | ||||
109 | Maintenance of Mobile Plant | → Link | ||||
110 | Use of Service Pit | → Link | ||||
120 | Replacing Moil on Hammer | → Link | ||||
121 | Battery Inspections and Maintenance | → Link | ||||
122 | Jump Start 12v Batteries | → Link | ||||
170 | Using Duro Fuel Tank | → Link | ||||
191 | Blowing out Air Filters | → Link | ||||
194 | Cleaning out Machine Cabins | → Link | ||||
215 | Oxy Cutting | → Link |
Safety Data Sheets (SDS)
→ means linked to PDF
Location – Map
The site is located near Cootamundra, on the Olympic Highway. Map
Emergency Response Plan
A copy of the Emergency Response Plan will be displayed prominently on site. Emergency Response Plan.
Traffic Management Plan
The Traffic Management Plan will be overlayed onto the site map and displayed prominently on site. Traffic Management Plan template. ! fix link !
Principle Mining Hazards
Principle Mining Hazards have been assessed for the site:
Principle Mining Hazard | Present on site? |
---|---|
Ground or strata failure | Yes |
Inundation or inrush | No |
Mines shafts and winding systems | No |
Roads and other vehicle operating areas | Yes |
Dust and other airborne contaminates | Yes |
Fire and explosion | Yes |
Gas outbursts | No |
Spontaneous Combustion | No |
Subsidence | No |
COVID-19 | Yes |
Principle mining hazard control plans are linked below:
Principal Hazard Control Plan – Ground or Strata Failure
Principal Hazard Control Plan – Roads and Other Vehicle Operating Areas
Principal Hazard Control Plan – Dust and Other Airborne Contaminates
Principal Hazard Control Plan – Fire and Explosion
Control Plans
The following control plans are applicable to Cootamundra Quarry:
Electrical Engineering Control Plan
Mechanical Engineering Control Plan
Explosives Control Plan
Use of Explosives Risk Assessment
Health Control Plan
Emergency Control Plan
Site Checklists
The following documents are to be used during site establishment and production: ! add links !
Plant Hazard and Risk Assessment
Toolbox Talk Form
Induction Template
Lifting Equipment Register
Inspections
Type | By | Frequency | Last Report | Next Report |
---|---|---|---|---|
Fire Extinguishers | Eacom | 6 Months | ||
Lifting Equipment | All Ways Rigging | 6 Months | ||
→ WHSE Inspection | WHSE Manager | 6 Months | ||
→ Extraction Inspection | Quarry Manager | Weekly | → | |
→ Housekeeping Inspection | Quarry Manager | Weekly | ||
Plant Pre Start Inspections | Operators | Daily | NA | NA |
Plant Structural Audit | Engineer | x Years |
Safety Documentation
The following documents will be kept on site:
Toolbox Book
Incident Reporting forms
Take 5 books
Contractor/Visitor register
Site Induction
All personnel on site have completed the Milbrae Site Induction.
All contractors and visitors will report to the Site Supervisor for induction prior to entry.
WHSE Management System
The Site Management Plan and the WHSE Management System complete the safety documentation for all sites. Access the WHSE Management System here.