SWMS Directory - By Number

Print Friendly and PDF

Number Name Review Date SWMS (Editable) SWMS (PDF) Procedure
001 Setting up Wheeled Mobile Crushing Plant 01/06/25 Link Link
002 Packing up Wheeled Mobile Crushing Plant 01/06/25 Link
003 Front End Loader - Mobile Crushing Operations 30/01/25 Link Link
003a Front End Loader - Wheeled Plant Operations →[Link][6]
004 Visitor Light Vehicle Operation In Quarry 12/07/25 Link → [Link][8]
005 Loading Trucks With Front End Loader 01/06/25 Link Link
006 Truck Operations In Quarry 18/07/25 Link
007 Changing Screens on Crushing Plant 27/07/25 Link
008 Cone Blockage Procedure 27/07/25 Link
009 Adjusting Jaw on Crushing Plant 27/07/25 Link
010 Using Excavator to Feed Crusher 01/06/25 Link
011 Working at Heights 01/06/25 Link
012 Loading Ballast Wagons Using Front End Loader
013 Confined Spaces 01/06/25 Link
014 Cleaning Under Plant With Skid Steer 16/09/25 Link Link
015 Operating the Extec 27/04/26 Link
016 Magazine Access & Shotfiring Link
017 Removing Jaw From the Extec 01/06/25 Link
018 Starting up Track Mounted Cone Crusher 01/06/25 Link
019 Shutting Down Track Mounted Cone Crusher 01/06/25 Link
020 Clearing the Crusher (Track Mounted Cone Crusher) 01/06/25 Link
021 Tyre Changing 01/06/25 Link
022 Sales loader operations 04/02/25 Link → [Link][28]
023 Vacant
024 Vacant
025 Vacant
026 Vacant
027 Operating Track Mounted Cone Crusher 01/06/25 Link
028a AZTEC 350 - Change Cone Liner 01/06/25 Link
029 Cedar Rapids - Change Cone Liner
030 Safe Use EWP 01/06/25 Link
031 Electric Welding 01/06/25 Link
032 Vacant
033 Vacant
034 Using Electric Power Tools 01/06/25 Link
035 Vacant
036 Vacant
037 Changing The Manganese on the MVP Cone Crusher 01/06/25 Link
038 Operation of Edge Stacker 01/06/25 → [Link][35]
039
040 Safe Use of Truck and Tipping Trailer 23/05/25 → [Link][36]
041 Vacant
042 Vacant
043 Vacant
044 Vacant
045 Vacant
046 Removing Jaw from Nordberg Crusher 01/06/25 Link
047 Changing Swing Jaw Liner on Wheeled Crushing Plant 01/06/25 Link
048 Changing Fixed Jaw Liner on Wheeled Crushing Plant 01/06/25 Link
049 Changing Screens on Wheeled Crushing Plant 01/06/25 Link Link
050 Using Excavator to Lift 01/06/25 Link
051 Setting up HP300 Cone Crusher 01/06/25 Link
052 Changing Screens on Metso Impactor Crushing Plant 25/05/26 Link
053 LT1213/LT1213S Adjusting Impactor 01/06/25 Link
054 Changing Screens on Powerscreen 01/06/25 Link
055 LT1213/LT1213S Seting Up Metso Impactor 01/05/26 Link
056 LT1213/LT1213S Replacing Wear Plates in Metso Impactor 26/05/26 Link
057 LT1213/LT1213S Replacing Blow Bars 01/06/25 Link
058 Operating and Refueling Small Motors 01/06/25 Link
059 Removing Swing Jaw From Sandvik Jaw Crusher 01/06/25 Link
060 Removing Fixed Jaw From Sandvik Jaw Crusher 01/06/25 Link
061 Changing Screens on Cone Crusher Plant 01/06/25 Link
062 Removing Hopper and Feeder From Wheeled Plant for Transport 01/06/25 Link
063 Warburn - Unblock Jaw With Jackhammer 01/06/25 Link
064 Start up Sandvik QH441 Cone Crusher 01/06/25 Link
065 Shut Down Sandvik QH441 Cone Crusher 01/06/25 Link
066 Setting up Sandvik QH441 Cone Crusher 01/06/25 Link
067 Blockage Procedure Sandvik QH441 Cone Crusher 01/06/25 Link
068 Installing Hopper and Feeder on Wheeled Plant 01/06/25 Link
069 Vacant
070 Abrasive Blasting 01/06/25 Link
071 ARC Gouging 01/06/25 Link
072 Operate Bandsaw 01/06/25 Link
073 Operate Punch and Shear 01/06/25 Link
074 Plasma Cutting 01/06/25 Link
075 Spray Painting 01/06/25 Link
076 Post Blast Clean Up 01/06/25 Link
077 Building Pad for Excavator 01/06/25 Link
078 Load Haul Truck with Excavator 02/02/26 Link
079 Jaw Blockage - Shutdown 02/05/26 Link
080 Jaw Blockage - Unblocking Live Jaw 18/08/25 Link Link
081 Blockage Under Jaw 01/06/25 Link
082 Adjusting Jaw WRQ 01/06/25 Link
083 Cone Blockage 01/06/25 Link
084 Adjusting 3' Cone 01/06/25 Link
085 Vacant
086 Unblock Chute in Tunnel 01/06/25 Link
087 Changing Drive Belts 01/06/25 Link
088 Patching Belts 201/06/25 Link
089 Roller Changeout 01/06/25 Link
090 Scalping 01/06/25 Link
091 Vacant
092 Vacant
093 Vacant
094 Vacant
095 Vacant
096 Stockpile Material From Crusher 01/06/25 Link
097 Working Alone → [Link]
098 Constructing a Bund Wall 01/06/25 Link
099 Transporting Plant Using Low Loader or Float 01/06/25 Link
100 General Maintenance of Crushers 01/07/25 Link
101 Vacant
102 LT1213 Replace Drive Belt on Impactor 26/05/26 Link
103 Operating Dozer 01/07/25 Link
104 LT1213 Repalce Conveyor Belt on Impactor 01/05/26 Link
105 Articulated Haul Truck – Operation-Stockpiling- Maintenance Link
106 Operation of Excavator with Attachment 01/07/25 Link →[Link][91]
107 Operation and Maintenance of Haul Truck 01/07/25 Link
108 Load Haul Truck with Loader 01/07/25 Link
109 Maintenance to Mobile Plant 01/07/25 Link
110 Use of Service Pit 01/07/25 Link
111 Articulated Bin Truck Operations - Warburn 15/03/26 Link → [Link][97]
112 Loading Customer with Skid Steer 01/07/25 Link
113 Loading Reinforcing Via Forklift 26/04/26 Link
114 Loading Reinforcing Via Overhead Crane 01/07/25 Link
115 Bending Reinforcing Steel 01/07/25 Link
116 Operation of Punch and Shear - Reinforcing 01/07/25 Link
117 Reinforcing Delivery via Hiab 01/07/25 Link
118 Unloading Reinforcing 01/07/25 Link
119 Operating Sandvik QJ341 Jaw 01/07/25 Link
120 Replacing Moil on Hammer 01/07/25 Link
121 Battery Inspections and Maintenance 01/07/25 Link
122 Jump Starting Batteries 01/07/25 Link
123 Front End Loader - Loading Bins 01/07/25 Link
124 Vacant
125 Vacant
126 Operating Sand Dredge 01/07/25 Link
127 Relocate Sand Dredge 01/07/25 Link
128 Modify Sand Dredge Delivery Line 01/07/25 Link
129 Vacant
130 Blast Security 01/07/25 Link
131 Drill and Blast Operations 01/07/25 Link Link
132 Changing Hydraulic Hoses on Drill Rig 01/07/25 Link
133 Daily Servicing of Drill Rig 01/07/25 Link
134 Drilling Blast Holes 01/07/25 Link
135 Fire on a Drill Rig 01/07/25 Link
136 Loading and Unloading a Drill Rig 01/07/25 Link
137 Refit Hydraulic Pump to Drill Rig 01/07/25 Link
138 Replace Air Compressor on Drill Rig 01/07/25 Link
139 Setting up Blast Monitors 01/07/25 Link
140 Towing a Trailer (Drill) 01/07/25 Link
141 Working Near Bench Faces 01/07/25 Link
142 Working on Rod Changer Assembly 01/07/25 Link
143 Refueling Prill Mixer 01/07/25 Link
144 Vacant
145 Vacant
146 Vacant
147 Vacant
148 Vacant
149 Operate Pugmill 01/07/25 Link
150 Loading Precast Panels 01/07/25 Link
151 Transport of Precast Panels 01/07/25 Link
152 Erection of Precast Panels 01/07/25 Link
153 Vacant
154 Vacant
155 QJ341 (Sandvik) Isolation 01/07/25 Link
156 QJ341 Setting up on Site Link
157 QJ341 Packing up for Transport Link
158 QJ341 Replacing Crusher Box Liner Plates 01/07/25 Link
159 QJ341 Removing Toggle Plate Link
160 QJ341 Removing Swing Jaw Plate 01/07/25 Link
161 QJ341 Removing Fixed Jaw Plate Link
162 QJ341 Installing Swing Jaw Plate 01/07/25 Link
163 QJ341 Installing Fixed Jaw Plate 01/07/25 Link
164 QJ341 Adjusting Side Conveyor Belt 01/07/25 Link
165 QJ341 Adjusting Main Conveyor Belt 01/07/25 Link
166 Vacant
167 Vacant
168 Vacant
169 Vacant
170 Operating Duro Diesel Tank 01/07/25 Link
171 Vacant
172 HP300HPS Isolation Procedure → [Link][144]
173 HP300 Changing Cone Liners 01/07/25 Link
174 Powerscreen H6203R Changing Between Walking and Operating Mode 01/09/25 Link
175 Powerscreen H6203R Isolation 01/07/25 Link
176 Powerscreen H6203R Site Set Up 01/07/25 Link
177 Crushing and Screening Operations 01/07/25 Link Link
178 Vacant
179 Vacant
180 Concrete Pumping with Truck Mounted Placing Boom 01/07/25 Link
181 Delivering Concrete 01/07/25 Link
182 Front End Loader in Concrete Batching 13/11/25 Link
183 Acid Washing Concrete Truck Link
184 Put Additives into Concrete Agitator via Platform 23/11/25 Link
185 Concrete - Recycling of waste 01/09/25 → [Link][156]
186 Vacant
187 Vacant
188 Vacant
189 Vacant
190 Vacant
191 Blowing out Air Filters 01/09/25 Link
192 Brake Test - Front End Loader 01/09/25 Link
193 Cedar Rapids Roller Cone - Adjust Close Side Settings 01/09/25 Link
194 Cleaning out Machine Cabins 01/09/25 Link
195 EC480D - Isolation Procedure 01/09/25 Link
196 Loadrite Scale Calibration 01/09/25 Link
197 Cedar Rapids Roller Cone - Top Assembly Removal 01/09/25 Link
198 972H Isolation Procedure 01/09/25 Link
199 972H Release of Hydraulic Pressure 01/09/25 Link
200 980H Isolation Procedure 01/09/25 Link
201 980H Release of Hydraulic Pressure 01/09/25 Link
Unnumbered Blasting Procedure → [Link][168]
202 Class 1 Pilot Operation 01/09/25 Link
203 Cleaning out tipper body 01/09/25 Link
Unnumbered Crushing and Screening Operations → [Link][171]
204 Drill and Blast - Discovery of Misfired Explosives 01/09/25 Link
205 Drill and Blast - Disposal of Deteriorated Explosives 01/09/25 Link
206 Drill and Blast - Firing Blast 01/09/25 Link
207 Drill and Blast - Inspection and Detection of Deteriorated Explosives 01/09/25 Link
208 Drill and Blast - Loading Blast Holes 01/09/25 Link
209 Drill and Blast - Tie In 01/09/25 Link
210 Front End Loader - Nymagee 01/09/25 → [Link][178]
211 Kue Ken Jaw → [Link][179]
212 Light Vehicle Wheel Change 01/09/25 Link
213 Light Vehicle Isolation 01/09/25 Link
214 Operate Bench Grinder 01/09/25 Link
215 Oxy Cutting 01/09/25 Link
216 Pulverising → [Link][184]
217 QE440 Isolation 01/09/25 Link
218 Rock Hammering 01/09/25 Link
219 Sand Blasting → [Link][187]
220 UJ440i Isolation 01/09/25 Link
221 Wheeled Plant - Site Set up → [Link][189]
222 Operate Angle Grinder 01/09/25 Link
223 Operating Excavator with Pulverising Attachment Link
224 C550 D5 Diesel Generator Set Start-up and Shut down - Colinroobie Link
225 LT300HPS Isolation Link
unnumbered