001 |
Setting up Wheeled Mobile Crushing Plant |
01/06/25 |
→Link |
|
→Link |
002 |
Packing up Wheeled Mobile Crushing Plant |
01/06/25 |
→Link |
|
|
003 |
Front End Loader - Mobile Crushing Operations |
30/01/25 |
→Link |
|
→Link |
003a |
Front End Loader - Wheeled Plant Operations |
|
→[Link][6] |
|
|
004 |
Visitor Light Vehicle Operation In Quarry |
12/07/25 |
→ Link |
|
→ [Link][8] |
005 |
Loading Trucks With Front End Loader |
01/06/25 |
→ Link |
|
→ Link |
006 |
Truck Operations In Quarry |
18/07/25 |
→ Link |
|
|
007 |
Changing Screens on Crushing Plant |
27/07/25 |
→ Link |
|
|
008 |
Cone Blockage Procedure |
27/07/25 |
→ Link |
|
|
009 |
Adjusting Jaw on Crushing Plant |
27/07/25 |
→ Link |
|
|
010 |
Using Excavator to Feed Crusher |
01/06/25 |
→ Link |
|
|
011 |
Working at Heights |
01/06/25 |
→ Link |
|
|
012 |
Loading Ballast Wagons Using Front End Loader |
|
|
|
|
013 |
Confined Spaces |
01/06/25 |
→ Link |
|
|
014 |
Cleaning Under Plant With Skid Steer |
16/09/25 |
→ Link |
|
→ Link |
015 |
Operating the Extec |
27/04/26 |
→ Link |
|
|
016 |
Magazine Access & Shotfiring |
|
→ Link |
|
|
017 |
Removing Jaw From the Extec |
01/06/25 |
→ Link |
|
|
018 |
Starting up Track Mounted Cone Crusher |
01/06/25 |
→ Link |
|
|
019 |
Shutting Down Track Mounted Cone Crusher |
01/06/25 |
→ Link |
|
|
020 |
Clearing the Crusher (Track Mounted Cone Crusher) |
01/06/25 |
→ Link |
|
|
021 |
Tyre Changing |
01/06/25 |
→ Link |
|
|
022 |
Sales loader operations |
04/02/25 |
→ Link |
|
→ [Link][28] |
023 |
Vacant |
|
|
|
|
024 |
Vacant |
|
|
|
|
025 |
Vacant |
|
|
|
|
026 |
Vacant |
|
|
|
|
027 |
Operating Track Mounted Cone Crusher |
01/06/25 |
→ Link |
|
|
028a |
AZTEC 350 - Change Cone Liner |
01/06/25 |
→ Link |
|
|
029 |
Cedar Rapids - Change Cone Liner |
|
|
|
|
030 |
Safe Use EWP |
01/06/25 |
→ Link |
|
|
031 |
Electric Welding |
01/06/25 |
→ Link |
|
|
032 |
Vacant |
|
|
|
|
033 |
Vacant |
|
|
|
|
034 |
Using Electric Power Tools |
01/06/25 |
→Link |
|
|
035 |
Vacant |
|
|
|
|
036 |
Vacant |
|
|
|
|
037 |
Changing The Manganese on the MVP Cone Crusher |
01/06/25 |
→ Link |
|
|
038 |
Operation of Edge Stacker |
01/06/25 |
→ [Link][35] |
|
|
039 |
|
|
|
|
|
040 |
Safe Use of Truck and Tipping Trailer |
23/05/25 |
→ [Link][36] |
|
|
041 |
Vacant |
|
|
|
|
042 |
Vacant |
|
|
|
|
043 |
Vacant |
|
|
|
|
044 |
Vacant |
|
|
|
|
045 |
Vacant |
|
|
|
|
046 |
Removing Jaw from Nordberg Crusher |
01/06/25 |
→ Link |
|
|
047 |
Changing Swing Jaw Liner on Wheeled Crushing Plant |
01/06/25 |
→ Link |
|
|
048 |
Changing Fixed Jaw Liner on Wheeled Crushing Plant |
01/06/25 |
→ Link |
|
|
049 |
Changing Screens on Wheeled Crushing Plant |
01/06/25 |
→ Link |
|
→ Link |
050 |
Using Excavator to Lift |
01/06/25 |
→ Link |
|
|
051 |
Setting up HP300 Cone Crusher |
01/06/25 |
→ Link |
|
|
052 |
Changing Screens on Metso Impactor Crushing Plant |
25/05/26 |
→ Link |
|
|
053 |
LT1213/LT1213S Adjusting Impactor |
01/06/25 |
→ Link |
|
|
054 |
Changing Screens on Powerscreen |
01/06/25 |
→ Link |
|
|
055 |
LT1213/LT1213S Seting Up Metso Impactor |
01/05/26 |
→ Link |
|
|
056 |
LT1213/LT1213S Replacing Wear Plates in Metso Impactor |
26/05/26 |
→ Link |
|
|
057 |
LT1213/LT1213S Replacing Blow Bars |
01/06/25 |
→ Link |
|
|
058 |
Operating and Refueling Small Motors |
01/06/25 |
→ Link |
|
|
059 |
Removing Swing Jaw From Sandvik Jaw Crusher |
01/06/25 |
→ Link |
|
|
060 |
Removing Fixed Jaw From Sandvik Jaw Crusher |
01/06/25 |
→ Link |
|
|
061 |
Changing Screens on Cone Crusher Plant |
01/06/25 |
→ Link |
|
|
062 |
Removing Hopper and Feeder From Wheeled Plant for Transport |
01/06/25 |
→ Link |
|
|
063 |
Warburn - Unblock Jaw With Jackhammer |
01/06/25 |
→ Link |
|
|
064 |
Start up Sandvik QH441 Cone Crusher |
01/06/25 |
→ Link |
|
|
065 |
Shut Down Sandvik QH441 Cone Crusher |
01/06/25 |
→ Link |
|
|
066 |
Setting up Sandvik QH441 Cone Crusher |
01/06/25 |
→ Link |
|
|
067 |
Blockage Procedure Sandvik QH441 Cone Crusher |
01/06/25 |
→ Link |
|
|
068 |
Installing Hopper and Feeder on Wheeled Plant |
01/06/25 |
→ Link |
|
|
069 |
Vacant |
|
|
|
|
070 |
Abrasive Blasting |
01/06/25 |
→ Link |
|
|
071 |
ARC Gouging |
01/06/25 |
→ Link |
|
|
072 |
Operate Bandsaw |
01/06/25 |
→ Link |
|
|
073 |
Operate Punch and Shear |
01/06/25 |
→ Link |
|
|
074 |
Plasma Cutting |
01/06/25 |
→ Link |
|
|
075 |
Spray Painting |
01/06/25 |
→ Link |
|
|
076 |
Post Blast Clean Up |
01/06/25 |
→ Link |
|
|
077 |
Building Pad for Excavator |
01/06/25 |
→ Link |
|
|
078 |
Load Haul Truck with Excavator |
02/02/26 |
→ Link |
|
|
079 |
Jaw Blockage - Shutdown |
02/05/26 |
→ Link |
|
|
080 |
Jaw Blockage - Unblocking Live Jaw |
18/08/25 |
→ Link |
|
→ Link |
081 |
Blockage Under Jaw |
01/06/25 |
→ Link |
|
|
082 |
Adjusting Jaw WRQ |
01/06/25 |
→ Link |
|
|
083 |
Cone Blockage |
01/06/25 |
→ Link |
|
|
084 |
Adjusting 3' Cone |
01/06/25 |
→ Link |
|
|
085 |
Vacant |
|
|
|
|
086 |
Unblock Chute in Tunnel |
01/06/25 |
→ Link |
|
|
087 |
Changing Drive Belts |
01/06/25 |
→ Link |
|
|
088 |
Patching Belts |
201/06/25 |
→ Link |
|
|
089 |
Roller Changeout |
01/06/25 |
→ Link |
|
|
090 |
Scalping |
01/06/25 |
→ Link |
|
|
091 |
Vacant |
|
|
|
|
092 |
Vacant |
|
|
|
|
093 |
Vacant |
|
|
|
|
094 |
Vacant |
|
|
|
|
095 |
Vacant |
|
|
|
|
096 |
Stockpile Material From Crusher |
01/06/25 |
→ Link |
|
|
097 |
Working Alone |
|
→ [Link] |
|
|
098 |
Constructing a Bund Wall |
01/06/25 |
→ Link |
|
|
099 |
Transporting Plant Using Low Loader or Float |
01/06/25 |
→ Link |
|
|
100 |
General Maintenance of Crushers |
01/07/25 |
→ Link |
|
|
101 |
Vacant |
|
|
|
|
102 |
LT1213 Replace Drive Belt on Impactor |
26/05/26 |
→ Link |
|
|
103 |
Operating Dozer |
01/07/25 |
→ Link |
|
|
104 |
LT1213 Repalce Conveyor Belt on Impactor |
01/05/26 |
→ Link |
|
|
105 |
Articulated Haul Truck – Operation-Stockpiling- Maintenance |
|
→ Link |
|
|
106 |
Operation of Excavator with Attachment |
01/07/25 |
→ Link |
|
→[Link][91] |
107 |
Operation and Maintenance of Haul Truck |
01/07/25 |
→ Link |
|
|
108 |
Load Haul Truck with Loader |
01/07/25 |
→ Link |
|
|
109 |
Maintenance to Mobile Plant |
01/07/25 |
→ Link |
|
|
110 |
Use of Service Pit |
01/07/25 |
→ Link |
|
|
111 |
Articulated Bin Truck Operations - Warburn |
15/03/26 |
→ Link |
|
→ [Link][97] |
112 |
Loading Customer with Skid Steer |
01/07/25 |
→ Link |
|
|
113 |
Loading Reinforcing Via Forklift |
26/04/26 |
→ Link |
|
|
114 |
Loading Reinforcing Via Overhead Crane |
01/07/25 |
→ Link |
|
|
115 |
Bending Reinforcing Steel |
01/07/25 |
→ Link |
|
|
116 |
Operation of Punch and Shear - Reinforcing |
01/07/25 |
→ Link |
|
|
117 |
Reinforcing Delivery via Hiab |
01/07/25 |
→ Link |
|
|
118 |
Unloading Reinforcing |
01/07/25 |
→ Link |
|
|
119 |
Operating Sandvik QJ341 Jaw |
01/07/25 |
→ Link |
|
|
120 |
Replacing Moil on Hammer |
01/07/25 |
→ Link |
|
|
121 |
Battery Inspections and Maintenance |
01/07/25 |
→ Link |
|
|
122 |
Jump Starting Batteries |
01/07/25 |
→ Link |
|
|
123 |
Front End Loader - Loading Bins |
01/07/25 |
→ Link |
|
|
124 |
Vacant |
|
|
|
|
125 |
Vacant |
|
|
|
|
126 |
Operating Sand Dredge |
01/07/25 |
→ Link |
|
|
127 |
Relocate Sand Dredge |
01/07/25 |
→ Link |
|
|
128 |
Modify Sand Dredge Delivery Line |
01/07/25 |
→ Link |
|
|
129 |
Vacant |
|
|
|
|
130 |
Blast Security |
01/07/25 |
→ Link |
|
|
131 |
Drill and Blast Operations |
01/07/25 |
→ Link |
|
→ Link |
132 |
Changing Hydraulic Hoses on Drill Rig |
01/07/25 |
→ Link |
|
|
133 |
Daily Servicing of Drill Rig |
01/07/25 |
→ Link |
|
|
134 |
Drilling Blast Holes |
01/07/25 |
→ Link |
|
|
135 |
Fire on a Drill Rig |
01/07/25 |
→ Link |
|
|
136 |
Loading and Unloading a Drill Rig |
01/07/25 |
→ Link |
|
|
137 |
Refit Hydraulic Pump to Drill Rig |
01/07/25 |
→ Link |
|
|
138 |
Replace Air Compressor on Drill Rig |
01/07/25 |
→ Link |
|
|
139 |
Setting up Blast Monitors |
01/07/25 |
→ Link |
|
|
140 |
Towing a Trailer (Drill) |
01/07/25 |
→ Link |
|
|
141 |
Working Near Bench Faces |
01/07/25 |
→ Link |
|
|
142 |
Working on Rod Changer Assembly |
01/07/25 |
→ Link |
|
|
143 |
Refueling Prill Mixer |
01/07/25 |
→ Link |
|
|
144 |
Vacant |
|
|
|
|
145 |
Vacant |
|
|
|
|
146 |
Vacant |
|
|
|
|
147 |
Vacant |
|
|
|
|
148 |
Vacant |
|
|
|
|
149 |
Operate Pugmill |
01/07/25 |
→ Link |
|
|
150 |
Loading Precast Panels |
01/07/25 |
→ Link |
|
|
151 |
Transport of Precast Panels |
01/07/25 |
→ Link |
|
|
152 |
Erection of Precast Panels |
01/07/25 |
→ Link |
|
|
153 |
Vacant |
|
|
|
|
154 |
Vacant |
|
|
|
|
155 |
QJ341 (Sandvik) Isolation |
01/07/25 |
→ Link |
|
|
156 |
QJ341 Setting up on Site |
|
→ Link |
|
|
157 |
QJ341 Packing up for Transport |
|
→ Link |
|
|
158 |
QJ341 Replacing Crusher Box Liner Plates |
01/07/25 |
→ Link |
|
|
159 |
QJ341 Removing Toggle Plate |
|
→ Link |
|
|
160 |
QJ341 Removing Swing Jaw Plate |
01/07/25 |
→ Link |
|
|
161 |
QJ341 Removing Fixed Jaw Plate |
|
→ Link |
|
|
162 |
QJ341 Installing Swing Jaw Plate |
01/07/25 |
→ Link |
|
|
163 |
QJ341 Installing Fixed Jaw Plate |
01/07/25 |
→ Link |
|
|
164 |
QJ341 Adjusting Side Conveyor Belt |
01/07/25 |
→ Link |
|
|
165 |
QJ341 Adjusting Main Conveyor Belt |
01/07/25 |
→ Link |
|
|
166 |
Vacant |
|
|
|
|
167 |
Vacant |
|
|
|
|
168 |
Vacant |
|
|
|
|
169 |
Vacant |
|
|
|
|
170 |
Operating Duro Diesel Tank |
01/07/25 |
→ Link |
|
|
171 |
Vacant |
|
|
|
|
172 |
HP300HPS Isolation Procedure |
|
|
|
→ [Link][144] |
173 |
HP300 Changing Cone Liners |
01/07/25 |
→ Link |
|
|
174 |
Powerscreen H6203R Changing Between Walking and Operating Mode |
01/09/25 |
|
|
→ Link |
175 |
Powerscreen H6203R Isolation |
01/07/25 |
→ Link |
|
|
176 |
Powerscreen H6203R Site Set Up |
01/07/25 |
→ Link |
|
|
177 |
Crushing and Screening Operations |
01/07/25 |
→ Link |
|
→ Link |
178 |
Vacant |
|
|
|
|
179 |
Vacant |
|
|
|
|
180 |
Concrete Pumping with Truck Mounted Placing Boom |
01/07/25 |
→ Link |
|
|
181 |
Delivering Concrete |
01/07/25 |
→ Link |
|
|
182 |
Front End Loader in Concrete Batching |
13/11/25 |
→ Link |
|
|
183 |
Acid Washing Concrete Truck |
|
→ Link |
|
|
184 |
Put Additives into Concrete Agitator via Platform |
23/11/25 |
→ Link |
|
|
185 |
Concrete - Recycling of waste |
01/09/25 |
|
|
→ [Link][156] |
186 |
Vacant |
|
|
|
|
187 |
Vacant |
|
|
|
|
188 |
Vacant |
|
|
|
|
189 |
Vacant |
|
|
|
|
190 |
Vacant |
|
|
|
|
191 |
Blowing out Air Filters |
01/09/25 |
|
|
→ Link |
192 |
Brake Test - Front End Loader |
01/09/25 |
|
|
→ Link |
193 |
Cedar Rapids Roller Cone - Adjust Close Side Settings |
01/09/25 |
|
|
→Link |
194 |
Cleaning out Machine Cabins |
01/09/25 |
|
|
→ Link |
195 |
EC480D - Isolation Procedure |
01/09/25 |
|
|
→ Link |
196 |
Loadrite Scale Calibration |
01/09/25 |
|
|
→ Link |
197 |
Cedar Rapids Roller Cone - Top Assembly Removal |
01/09/25 |
|
|
→ Link |
198 |
972H Isolation Procedure |
01/09/25 |
|
|
→ Link |
199 |
972H Release of Hydraulic Pressure |
01/09/25 |
|
|
→ Link |
200 |
980H Isolation Procedure |
01/09/25 |
|
|
→ Link |
201 |
980H Release of Hydraulic Pressure |
01/09/25 |
|
|
→ Link |
Unnumbered |
Blasting Procedure |
|
|
|
→ [Link][168] |
202 |
Class 1 Pilot Operation |
01/09/25 |
|
|
→ Link |
203 |
Cleaning out tipper body |
01/09/25 |
|
|
→ Link |
Unnumbered |
Crushing and Screening Operations |
|
|
|
→ [Link][171] |
204 |
Drill and Blast - Discovery of Misfired Explosives |
01/09/25 |
|
|
→ Link |
205 |
Drill and Blast - Disposal of Deteriorated Explosives |
01/09/25 |
|
|
→ Link |
206 |
Drill and Blast - Firing Blast |
01/09/25 |
|
|
→ Link |
207 |
Drill and Blast - Inspection and Detection of Deteriorated Explosives |
01/09/25 |
|
|
→ Link |
208 |
Drill and Blast - Loading Blast Holes |
01/09/25 |
|
|
→ Link |
209 |
Drill and Blast - Tie In |
01/09/25 |
|
|
→ Link |
210 |
Front End Loader - Nymagee |
01/09/25 |
|
|
→ [Link][178] |
211 |
Kue Ken Jaw |
|
|
|
→ [Link][179] |
212 |
Light Vehicle Wheel Change |
01/09/25 |
|
|
→ Link |
213 |
Light Vehicle Isolation |
01/09/25 |
|
|
→ Link |
214 |
Operate Bench Grinder |
01/09/25 |
|
|
→ Link |
215 |
Oxy Cutting |
01/09/25 |
|
|
→ Link |
216 |
Pulverising |
|
|
|
→ [Link][184] |
217 |
QE440 Isolation |
01/09/25 |
|
|
→ Link |
218 |
Rock Hammering |
01/09/25 |
|
|
→ Link |
219 |
Sand Blasting |
|
|
|
→ [Link][187] |
220 |
UJ440i Isolation |
01/09/25 |
|
|
→ Link |
221 |
Wheeled Plant - Site Set up |
|
|
|
→ [Link][189] |
222 |
Operate Angle Grinder |
01/09/25 |
|
|
→ Link |
223 |
Operating Excavator with Pulverising Attachment |
|
|
|
→ Link |
224 |
C550 D5 Diesel Generator Set Start-up and Shut down - Colinroobie |
|
|
|
→ Link |
225 |
LT300HPS Isolation |
|
|
|
→ Link |
unnumbered |
|
|
|
|
|